Jalali, Meysam. (1397). Tunnel Rehabilitation in Fault Zone Using Sequential Joints Method- Case Study: Karaj Water Conveyance Tunnel. , 52(1), 87-94. doi: 10.22059/ijmge.2018.66155
Meysam Jalali. "Tunnel Rehabilitation in Fault Zone Using Sequential Joints Method- Case Study: Karaj Water Conveyance Tunnel". , 52, 1, 1397, 87-94. doi: 10.22059/ijmge.2018.66155
Jalali, Meysam. (1397). 'Tunnel Rehabilitation in Fault Zone Using Sequential Joints Method- Case Study: Karaj Water Conveyance Tunnel', , 52(1), pp. 87-94. doi: 10.22059/ijmge.2018.66155
Jalali, Meysam. Tunnel Rehabilitation in Fault Zone Using Sequential Joints Method- Case Study: Karaj Water Conveyance Tunnel. , 1397; 52(1): 87-94. doi: 10.22059/ijmge.2018.66155