Time Driven Activity Based Costing : Theory,Applications and Limitations | ||
Interdisciplinary Journal of Management Studies (Formerly known as Iranian Journal of Management Studies) | ||
مقاله 1، دوره 9، شماره 3، مهر 2016، صفحه 457-482 اصل مقاله (525.61 K) | ||
نوع مقاله: Review article | ||
شناسه دیجیتال (DOI): 10.22059/ijms.2016.57481 | ||
نویسنده | ||
Mohammad Namazi* | ||
Professor of Accounting, College of Economics, Management and Social Sciences, Shiraz University, Shiraz, Iran | ||
چکیده | ||
The aim of this study is to explore the strategic applications and limitations of Time-driven Activity-based Costing (TDABC) and to evaluate the degree of accuracy of the proponents’ arguments concerning its usefulness. In this study, published works directly related to this area from the period 2004-2015 are analyzed. This study reports TDABC's applications in strategic areas such as cost of production, unused capacity, price determination, customer profitability analysis, and modeling complex decisions in various small, medium, and large private, governmental, and nonprofit service and manufacturing organizations. However, since they are not based on any concrete empirical investigations, only future empirical studies can authentically reveal the advantages of this technique. TDABC also severely suffers from the following spheres: it lacks the ability to identify activities in the first implementation step, such as practical capacity costs rate, uniform capacity costs rate, managers’ time estimation for each activity, determination of unused capacity, as well as lack of data accuracy, and limitations of managerial decision makings. As a result of these drawbacks, proponents’ arguments regarding TDABC’s usefulness and its widespread applications -in the future and around the world- are baseless. | ||
کلیدواژهها | ||
Activity-based Costing (ABC)؛ Activity-based Management (ABM)؛ Strategic Management؛ Time-driven Activity-based Costing (TDABC) | ||
مراجع | ||
Adioti, A.A.& Valverde, R.(2014). “Time-driven Activity Based costing for the Improvement of IT Service Operations". International Journal of Business and Management, 9(1), 109-128.
Adkins, T.(2008).“Five Myths about Time-driven Activity-based Costing. Sascom Magazine, Second Quarter, PP. 1-5.
Alinezhad SarkolaeiM;SavizM;Fathi MoradlooM; & Soleimani DahajN.(2013). “TimeDrivenActivity Based Costing by using Fuzzy Logics”.Procedia-Social and Behavioral Sciences,(75), 338-345.
Anderson, S.;Prokop,K;&Kaplan, R. S.(2007). “Fast-track Profit Models: More Powerful Due-Diligence Process for Managers and Acquisitions”.The Journal of Private Equity,10(3),22-34.
Barrett,R.(2005).”Time-driven Costing: The Bottom Line on the New ABC”.Business Performance Management Magazine,(11),35-39.
BryonK,;Everaert,P;LauwersL &Van Meensel,J.(2009).”Time-Driven Activity- based Costing for Supporting Sustainability Decisions in Pig Production.Corporate ResponsibilityResearch”CongressBelfast(UK):CRRConference,Retrievedfromhttp://crrconference. org/downloads/lauwers.pdf.
Cooper R (1987a.).The two stage procedure in cost accounting: Part one. Journal of Cost Management. 1(2): 43-51.
Cooper R. (1987b.).The two-stage procedure in cost accounting: Part two", Journal of Cost Management. 1(3): 39-45.
Cooper,R.(1989).“The Rise of Activity-based Costing: Part Three: How Many Cost Drivers Do You Need, and How Do You Select Them?”.Journal of Cost Management. 2(4),34-46.
Dalci,I;Tanis,V&Kosan,L.(2010).”Customer Profitability Analysis with Time-driven Activity Based Costing: A Case Study in a Hotel”.International Journal of Contemporary Hospitality Management.22(5),509-637.
DemeereN,StouthuysenK,&RoodhooftF.(2009). “Time-driven Activity-based Costing in an Outpatient Clinic Environment: Development, Relevance and Managerial Impact”.Health Policy.; 92(2-3),296-304.
EveraertP,&Bruggeman,W.(2007).Time-driven Activity-based Costing: Exploring the Underlying Model”.Cost Management.21(2),16-20.
Everaert,P;Bruggeman,W,&Decreus,G. (2008).”Sanac Inc.: From ABC to Time-driven ABC (TDABC) -An Instructional Case”.Journal of Accounting Education. 26(3),118-154.
Everaert, P;Bruggeman,W;Sarens,G,;Anderson,S.R,&Levant,Y. (2008).Cost Modeling in Logistics Using Time-driven ABC: Experiences from a Wholesaler”.International Journal of Physical Distribution & Logistics Management.38(3),172-191.
Geri,N,&Ronen,B.(2005).” Relevance Lost: The Rise and Fall of Activity-based Costing”HumanSystems Management.24(2),133-144.
Gervais,M; Levant,Y, &Ducrocq,C.( 2010).”Time Driven Activity Based Costing(TDABC): AnInitial Appraisal Through a Longitudinal Case Study”.Journal of Management Accounting Research.8 (2), 1-20.
Hajiha,Z,& Safari Alishah, S.(2011).“Implementation of Time-driven Activity Based Costing System and Customer Profitability Analysis in the HospitalityIndustry:Evidence from Iran”, Economics and Finance Review.1(8),57-67.
Homburg,C.(2005).”Using Relative Profits as an Alternative to Activity-based Costing”. International Journal of Production Economics.95(3),387-397.
Hoozee,S.(2013). “Designing Time Driven Activity Based Cost Systems: A Review and Future Research” in the Chapter 9 of TheRoutledgeCompanion to Cost Management, Edited by, Falconer M,H.Norreklit and M. Jakobson,Amazon.
Hoozée S,&Bruggeman,W.(2010).“Identifying Operational Improvements During the Design Process of a Time-driven ABC System: The Role of Collective Worker Participation and Leadership Style”. Management Accounting Research. 21(3),185-198.
Ittner, C.D. (1999).“Activity–based Costing Concepts for Quality Improvement”.European Management Journal.17(5),492-500.
Kaplan, A.L.;Agarwal, N,;Setlur,N.P,;Tan, H. J.;Niedzwiecki,D.; McLaughlin,N.;Burke,M.A.;Steinberg,K,.;Chamie, K.; Saigal,C.S.(2015). “Measuring theCost of Care in Benign Prostatic Hyperplasia using Time-driven Activity–based Costing (TDABC)”.Healthcare,3(1),43-48.
Kaplan,R.S.&Anderson,S.R.(2004). “Time-driven Activity-based Costing”.Harvard Business Review,82(11),131-138.
Kaplan,R.S.&Anderson,S.R.(2007a).“Time-Driven Activity-Based Costing: A Simpler and More Powerful Path to Higher Profits”.Harvard Business School Press.Massachusetts.
Kaplan,R.S.&Anderson, S.R.(2007b).“The Speed-reading Organization, Revving up Finance with Time-driven Activity-based Costing”.Business Finance.June,PP.39-42.
Kaplan,R. S.&Anderson S.R.(2007c). “The Innovation of Time-driven Activity-based Costing”.Cost Management.21(2),5-15.
Kaplan,R.S.&Atkinson A.A.(2005).Advanced Management Accounting, Third Edition, Prentice-Hall. Englewood.
Kaplan, R.S.&Porter, M.(2011). “The Big Idea: How to Solve the Cost Crises in Health Care”.Harvard Business Review.(3),PP. 1-13.
Madhok A, Keyhani M, Bossink B .2015.Understanding alliance evolution and termination: Adjustment costs and the economics of resource value .Strategic Organization. 13(2): 91-116.Maher,M.W,&Marais,M.L. (1998). “A Field Study on the Limitations of Activity Based Costing When Resources Are Provided on a Joint and Indivisible Basis”.Journal of Accounting Research.36(1),PP.129-142.
Mandigo,M; O'Neill, K.;Mistry,B.; Mundy, B.; Millien, C.;Nazaire Y.; Damuse,R.; Pierre,C.;Mugunga,J.C.; Gillies, R.; Lucien,F.;Bertrand, K.; Luo, E.; Costas, A.; Greenberg, S.L. M.; Meara, J.G,&Kaplan,R. A.(2015). “Time-driven Activity-based Costing Model to Improve Health-care Resource Use in Mirebalais, Haiti”,Harvard Medical School, Vol.385,P.22.
Monroy,C.R,;Nasiri,A,&Pelaez,M.A.(2012).”Activity Based Costing, Time-driven Activity Based Costing and Lean Accounting: Differences among Three Accounting Systems' Approach to Manufacturing”,6th International Conference on Industrial Engineering & Industrial Management, Vigo, July 18-20,401-409.
Namazi, M. (2009).”Performance- Focused ABC: A Third Generation of Activity-based Costing System”.Cost Management. 23(5),34-46.
Noreen,E.&Soderstrom,N.(1994). “Are Overhead Costs Strictly Proportional to Their Activity: Evidence from Hospital Service Departments?”Journal of Accounting and Economics.17 (1-2), 255-278.
O'Brien,T.&Rash,S.(2013).“Making the Most of Electronic Medical Records through Time-driven Activity- based Costing”.http://Becker's Hospital Review, October.
Öker, F.& Özyapc,H. (2013).”A New Costing Model in Hospital Management: Time-driven Activity-based Costing System”.The Health Care Manager. 32(1),23-36.
Özbayrak,M.;Akgün,M.&Türker,A.K.(2004).“Activity-based Cost Estimation in a Push/Pull Advanced Manufacturing System”.International Journal of Production Economics.87(1),49-65.
Oztaysi,B.; Baysan,S.& Akpinar,F.(2007).Effects of RFID on Tourism Sector: A Hypothetical Case Study.In F. Dimanch(ed.), Tourism, Mobility, and Technology,Proceedings of the Travel and Tourism Research Association Europe,Annual Conference,Nice,France(pp. 263-269).
Pernot,E.; Roodhooft,F.& Van den Abbeese,A.(2007).“Time-Driven Activity-based Costing for Inter-library Services: A Case Study in a University”.The Journal of Academic Librarianship.33(5), 551-560.
Ratnatunga, J.;TSe, M. &Balachandran,K.R. (2012).”Cost Management in Sri Lanka: A Case Study on Volume, Activity and Time as Cost Drivers”.The International Journal of Accounting.47(3),281-301.
Ratnatunga,J. & Waldmann, E.(2010). “Transparent Costing: Has the Emperor Got Clothes?”.AccountingForum. 34(3-4),196-210.
Reddy, K.; Venter, H.& Olivier, M. (2011). “Using Time-driven Activity-based Costing to Manage Digital Forensic Readiness in Large Organizations”. InformationSystems Frontiers.14(5),1-17.
Schuhmacher,K. & Burkert, M.(2014). “Traditional ABC and TimeDriven ABC: An Experimental InvestigationAAA”.Management Accounting Section(MAS)Meeting,http://SSRN, New York,USA.
Shank,J.K. &Govindrajan, V.(1995).“Strategic Cost management and Value Chain”.in Reading & Issues in Cost Management, Edited by J. M. Reeve, South Western College Publishing.
Siguenza-Guzman,L.; Van den Abbeele A.; Vandewalle J.; Verhaaren H.& Cattrysse, D.(2013). “Recent Evolutions in Costing Systems: ALiterature Review of Time-driven Activity-based Costing”.ReBEL - Review of Business and Economic Literature.58(1),34–64.
Siguenza-Guzman L.; Van den Abbeele A.; Vandewalle J.; Verhaaren H.;& Cattrysse, D.(2014). “Using Time-driven Activity-based Costing to Support Library Management Decisions: A Case Study for Lending and Returning Processes”.Library Quarterly: Information, Community, Policy. 84(1),76–98.
Smith,M.(2015).Research Methods in Accounting,3nd Edition.Sage Publication Ltd., London.
Stout, D.E. & Propri J.M.(2011).“ImplementingTime-driven Activity- based Costing at a Medium-sized Electronic Company”.Management Accounting Quarterly. 12(3),1-11.
Somapa, S.; Cools, M.;& Dullaert, W.(2010). “Time Driven Activity Based Costing in a Small Road Transport and Logistics Company”.Antwerp University Press, PP. 281–300, presented at the Vervoerslogistieke, November 18-19.
Somapa, S.; Cools, M.& Dullaert, W.(2011).“The Development of Time Driven Activity-based Costing Models: A Case Study in a Road Transport and Logistics Company”. InCurrent Issues in Shipping, Ports and Logistics,PP. 431–445.
Somapa,S.;Cools,M. & Dullart,W.(2012).”Unlocking the Potential of Time-driven Activity Based Costing for Small Logistics Companies". International Journal of Logistics Research and Applications.15 (5), 303-322.
Stout, D.& Propri,J.(2011). “Implementing Time-driven Activity-based Costing at aMedium-sized Electronics Company". Management Accounting Quarterly.12(3),1–11.
Stouthuysen, K.;Swiggers, M.; Reheul, A.M.&Roodhooft, F.(2010). “Time-drivenActivity-basedCosting for a Library Acquisition Process: A Case Study in a Belgian University". Library Collections, Acquisitions, and Technical Services. 34(2-3), 83–91.
Terungwa,A.(2012). “Practicability of Time-driven Activity-based Costing: A Profitability of Restaurants in Makurdi Metropolis of Benue State, Nigeria". Journal of Contemporary Management. 13(3), 33-44.
TSe,M.&Gong,M.(2009). “Recognition of Idle Resources in Time-Driven Activity- based Costing and Resource Consumption Accounting Models". Journal of Applied Management AccountingResearch.7 (2), 41-54.
Wu,X.;Wang,Y.;Yue,D.& Sun,Z. (2011).“Modeling and Error AnalysisofTime-driven Activity-based Costing". Industrial Engineering and Engineering Management (IE & EM), IEEE 18 the International Conference, September 3-5, (1),401- 405. | ||