Esmaelian, Majid, Bakran, Hajar. (1393). Preventive maintenance scheduling with integer programming and constraint programming. , 6(3), 433-452. doi: 10.22059/imj.2014.50688
Majid Esmaelian; Hajar Bakran. "Preventive maintenance scheduling with integer programming and constraint programming". , 6, 3, 1393, 433-452. doi: 10.22059/imj.2014.50688
Esmaelian, Majid, Bakran, Hajar. (1393). 'Preventive maintenance scheduling with integer programming and constraint programming', , 6(3), pp. 433-452. doi: 10.22059/imj.2014.50688
Esmaelian, Majid, Bakran, Hajar. Preventive maintenance scheduling with integer programming and constraint programming. , 1393; 6(3): 433-452. doi: 10.22059/imj.2014.50688





سامانه مدیریت نشریات علمی. قدرت گرفته از سیناوب