Environmental implications on blasting operations in Indian quarry mines | ||
International Journal of Mining and Geo-Engineering | ||
مقاله 7، دوره 58، شماره 3، آذر 2024، صفحه 289-294 اصل مقاله (352.3 K) | ||
نوع مقاله: Research Paper | ||
شناسه دیجیتال (DOI): 10.22059/ijmge.2024.355043.595034 | ||
نویسندگان | ||
Ajay Kumar* 1؛ Sandeep Prasad2؛ R Sudhakar Reddy2 | ||
1Department of Computer Science and Engineering, Manipal University Jaipur, India. | ||
2Department of Mining Engineering, AKS University, Satna, India. | ||
چکیده | ||
In conventional opencast mining, blasting plays a significant role in mining activity. Basically, blasting is done in mining activity to create fragmentation. In the process of fragmentation via blasting, a lot of side effects arise. The prominent side effects include flyrock, airblast, and ground vibration. Also, the fragmentation size desired by mine owners differs for different minerals. So, usage of the type of explosive and quantity of explosive should be optimum, as it results in an increased magnitude of side effects such as flyrock, airblast, and ground vibrations. Like how space, burden, stemming material type, and stemming column height do affect all of the aforementioned negative effects. In this article, a case study of Indian mines measures the unfriendly impacts of blasting in opencast mining. | ||
کلیدواژهها | ||
Fly rock؛ Airblast, Ground vibrations, Sound level, Nonels & Stemming | ||
مراجع | ||
[1] Crandell, F. J. (1949). Ground vibration due to blasting and its effect upon structures. Boston Society of Civil Engineers.
[2] Nicholls, H. R., Johnson, C. F., & Duvall, W. I. (1971). Blasting vibrations and their effects on structures (p. 656). Washington: US Government Printers.
[3] Rockwell, E. H. (1927). Vibrations caused by quarry blasting and their effect on structures. Rock Products, 30(3), 58-61.
[4] Choi, B. H., Ryu, C. H., Deb, D., Jung, Y. B., & Jeong, J. H. (2013). Case study of establishing a safe blasting criterion for the pit slopes of an open-pit coal mine. International Journal of Rock Mechanics and Mining Sciences, 57, 1-10. https://doi.org/10.1016/j.ijrmms.2012.07.014.
[5] Reddy, S., Tripathi, A. K., & Parida, S. (2020). Influence of stemming material on performance of blasting. PalArch's Journal of Archaeology of Egypt/Egyptology, 17(7), 9797-9809.
[6] Young, O. E., & Lenon, R. (2016). Black powder and hand steel: Miners and machines on the old Western frontier. University of Oklahoma Press.
[7] Manzoor, S., Liaghat, S., Gustafson, A., Johansson, D., & Schunnesson, H. (2020). Establishing relationships between structural data from close-range terrestrial digital photogrammetry and measurement while drilling data. Engineering Geology, 267, 105480. https://doi.org/10.1016/j.en ggeo.2020.105480
[8] Pathak, J., & Dias, M. F. (1987). Microprocessor-controlled down-the-hole drill for enhancing productivity and accuracy in underground hardrock bulk mining methods. IEEE transactions on industry applications, (6), 1099-1104. DOI: 10.1109/TIA.1987.4505038.
[9] Liu, K., Yang, J., Li, X., Hao, H., Li, Q., Liu, Z., & Wang, C. (2018). Study on the long hole raising technique using one blast based on vertical crater retreat multiple deck shots. International Journal of Rock Mechanics and Mining Sciences, 109, 52-67. https://doi.org/10.1016/j.ijrmms.2018. 06.020
[10] Michaux, S., & Djordjevic, N. (2005). Influence of explosive energy on the strength of the rock fragments and SAG mill throughput. Minerals engineering, 18(4), 439-448. https://doi.org/10.1016/j.mineng. 2004.07.003
[11] Mandal, S. K., Singh, M. M., & Dasgupta, S. (2008). Theoretical concept to understand plan and design smooth blasting pattern. Geotechnical and Geological Engineering, 26(4), 399-416. https://doi.org/10.1007/s10706-008-9177-4.
[12] Reddy, S., Tripathi, A. K., & Parida, S. (2020). Influence of stemming material on performance of blasting. PalArch's Journal of Archaeology of Egypt/Egyptology, 17(7), 9797-9809.
[13] Qiu, X., Shi, X., Zhang, S., Liu, B., & Zhou, J. (2018). Experimental study on the blasting performance of water-soil composite stemming in underground mines. Advances in Materials Science and Engineering, 2018. https://doi.org/10.1155 /2018/3523509
[14] Singh, P. K., & Roy, M. P. (2010). Damage to surface structures due to blast vibration. International Journal of Rock Mechanics and Mining Sciences, 47(6), 949-961. https://doi.org/10.1016/j.ijrmms. 2010.06.010
[15] Singh, P.K., Vogt, W., Singh, R.B. and Singh, D.P. (1996) Blasting Side Effects—Investigations in an Opencast Coal Mine in India. International Journal of Surface Mining Reclamation and Environment, 10, 155-159. http://dx.doi.org/10.1080/092 08119608964824
[16] Faramarzi Farhad, E.F. (2014) Simultaneous Investigation of Blast Induced Ground Vibration and Airblast Effects on Safety Level of Structures and Human in Surface Blasting. International Journal of Mining Science and Technology, 663-669. http://dx.doi.org/10.1016/j.ijmst. 2014.07.006
[17] Aler, J., Du Mouza, J., & Arnould, M. (1996). Measurement of the fragmentation efficiency of rock mass blasting and its mining applications. In International journal of rock mechanics and mining sciences & geomechanics abstracts (Vol. 33, No. 2, pp. 125-139). Pergamon. https://doi.org/10.1016/0148-9062(95)000 54-2
[18] Roy, P. P. (1991). Prediction and control of ground vibration due to blasting. Colliery Guardian;(United Kingdom), 239(7).
[19] Mandal, B. B. (2014). Implementation of DGMS guidelines for ergonomics risk assessment of mining operations. In national workshop on applied ergonomics for mining. National Institute of miners (pp. 36-43).
[20] Choudhary, B. S., & Agrawal, A. (2019). Blast assessment to improve productivity and safety of habitats in dolomitestone quarry using artificial intelligence. In National Seminar Digitization and e-Governance in Mining Industry, Udaipur.
[21] Rudenko, D. (2002). An analytical approach for diagnosing and solving blasting complaints. Journal of Explosives Engineering, 19(4), 36-41.
[22] Minimate Blaster Operator manual (1990-2013 XMARK Corp. Instantel, the Instantel logo, Auto Call Home, Blastmate, Blastware, Micromate, Minimate and Histogram Combo are trademarks of Stanley Black & Decker, Inc., or its affiliates. trademarks of Microsoft Corporation 716U3001 Rev 03). https://www.geonor.com/brochures/minimate-blaster.pdf
[23] Das, R., Sharma, P., & Singh, R. (2019). Use of Non-explosive Demolition Agents in Indian Quarry Mines. Journal of Sustainable Mining, 8(2), 45-54.
[24] Gupta, A., & Sharma, V. (2021). AI-based Real-time Monitoring Systems in Quarry Mines: Case Studies from India. Mining Technology, 12(3), 67-78.
[25] Jain, S., Patel, A., & Kumar, V. (2018). Air Pollution from Blasting Operations in Indian Quarry Mines. Environmental Monitoring and Assessment, 190(11), 657.
[26] Kumar, S., Singh, N., & Das, A. (2020). Predictive Analytics in Blasting Operations: Enhancing Efficiency and Sustainability. International Journal of Mining Science and Technology, 30(4), 493-502.
[27] Mishra, R., Verma, S., & Roy, P. (2016). Noise Pollution and Its Control in Quarry Mines of India. Environmental Science and Pollution Research, 23(12), 12245-12253.
[28] Patel, K., Kumar, S., & Gupta, N. (2022). Automation in Blasting Operations: Environmental and Operational Benefits. Journal of Mining Engineering, 15(1), 34-49.
[29] Sharma, P., Thakur, J., & Singh, R. (2019). Ecological Impacts of Quarry Mining: A Case Study from India. Journal of Environmental Management, 233, 318-328.
[30] Singh, R., & Roy, S. (2017). Ground Vibrations Due to Blasting in Quarry Mines: A Case Study from India. Bulletin of Engineering Geology and the Environment, 76(1), 177-185.
[31] Singh, V., Verma, M., & Rao, K. (2021). Optimized Blast Design for Environmental Sustainability in Indian Quarries. Rock Mechanics and Rock Engineering, 54(6), 3015-3029.
[32] Verma, P., & Rao, S. (2018). Controlled Blasting Techniques in Indian Quarry Mines. Journal of Mining Science, 54(4), 675-684. | ||