Ahmadizar, Fardin, Mahdavi, Kasra, Arkat, Jamal. (1397). Unrelated parallel machine scheduling with processing constraints and sequence dependent setup times. , 52(4), 495-507. doi: 10.22059/jieng.2019.240353.1425
Fardin Ahmadizar; Kasra Mahdavi; Jamal Arkat. "Unrelated parallel machine scheduling with processing constraints and sequence dependent setup times". , 52, 4, 1397, 495-507. doi: 10.22059/jieng.2019.240353.1425
Ahmadizar, Fardin, Mahdavi, Kasra, Arkat, Jamal. (1397). 'Unrelated parallel machine scheduling with processing constraints and sequence dependent setup times', , 52(4), pp. 495-507. doi: 10.22059/jieng.2019.240353.1425
Ahmadizar, Fardin, Mahdavi, Kasra, Arkat, Jamal. Unrelated parallel machine scheduling with processing constraints and sequence dependent setup times. , 1397; 52(4): 495-507. doi: 10.22059/jieng.2019.240353.1425


Contact Us | Help & Support | Site Map

Journal Management System. Designed by sinaweb.