Farughi, Hiwa, Payandeh, Saadi, Abdi, Farid. (1398). Multi-objective Project Scheduling Considering Discrete Resource Constraints Problem with Multiple Crashable Modes and Mode-identity Capabilities. , 11(2), 351-379. doi: 10.22059/imj.2019.268307.1007514
Hiwa Farughi; Saadi Payandeh; Farid Abdi. "Multi-objective Project Scheduling Considering Discrete Resource Constraints Problem with Multiple Crashable Modes and Mode-identity Capabilities". , 11, 2, 1398, 351-379. doi: 10.22059/imj.2019.268307.1007514
Farughi, Hiwa, Payandeh, Saadi, Abdi, Farid. (1398). 'Multi-objective Project Scheduling Considering Discrete Resource Constraints Problem with Multiple Crashable Modes and Mode-identity Capabilities', , 11(2), pp. 351-379. doi: 10.22059/imj.2019.268307.1007514
Farughi, Hiwa, Payandeh, Saadi, Abdi, Farid. Multi-objective Project Scheduling Considering Discrete Resource Constraints Problem with Multiple Crashable Modes and Mode-identity Capabilities. , 1398; 11(2): 351-379. doi: 10.22059/imj.2019.268307.1007514





سامانه مدیریت نشریات علمی. قدرت گرفته از سیناوب