Nabipour Afrazi, Elham, Aghaei, Abdollah. (1397). Robust Optimization of Resource-constrained Multi-Project Scheduling Problem with Uncertain Activities Duration. , 52(2), 291-307. doi: 10.22059/jieng.2018.237585.1402
Elham Nabipour Afrazi; Abdollah Aghaei. "Robust Optimization of Resource-constrained Multi-Project Scheduling Problem with Uncertain Activities Duration". , 52, 2, 1397, 291-307. doi: 10.22059/jieng.2018.237585.1402
Nabipour Afrazi, Elham, Aghaei, Abdollah. (1397). 'Robust Optimization of Resource-constrained Multi-Project Scheduling Problem with Uncertain Activities Duration', , 52(2), pp. 291-307. doi: 10.22059/jieng.2018.237585.1402
Nabipour Afrazi, Elham, Aghaei, Abdollah. Robust Optimization of Resource-constrained Multi-Project Scheduling Problem with Uncertain Activities Duration. , 1397; 52(2): 291-307. doi: 10.22059/jieng.2018.237585.1402


سامانه مدیریت نشریات علمی. قدرت گرفته از سیناوب