- Dempster, A. P. (1967). “Upper and lower probabilities induced by a multivalued mapping”, The annals of mathematical statistics, Vol. 38 No. 2 PP. 325-339.
- Shafer, G. (1976). A mathematical theory of evidence, Princeton University press Princeton, Vol. 1.
- Kohlas, J. and P. A. Monney. (2013). “A mathematical theory of hints: An approach to the Dempster-Shafer theory of evidence”, Springer Science & Business Media, Vol. 425, No.1, PP-1-47.
- Smets, P. and R. Kennes. (1994). “The transferable belief model”, Artificial intelligence, Vol. 66, No. 2, PP. 191-234.
- Troiano, L., Rodríguez-Muñiz, L. J. and Díaz, I. (2015). “Discovering user preferences using Dempster–Shafer theory”, Fuzzy Sets and Systems, Vol. 278, PP. 98-117.
- Nodoust, S., Mirzazadeh, A. and Mohammadi, M. (2016). “A Genetic Algorithm for an inventory system under belief structure inflationary conditions”, RAIRO-Operations Research, Vol. 50, No. 4-5, PP. 1027-1041.
- Ouyang, L. Y. and Wu, K. S. (1997). “Mixture inventory model involving variable lead time with a service level constraint”, Computers & Operations Research, Vol. 24, No. 9, PP. 875-882.
- Tersine, R. J. (1994). Principles of inventory and materials management. IIE transactions, Vol. 26, No. 2, PP 97-101.
- Tadikamalla, P. R. (1979). “The lognormal approximation to the lead time demand in inventory control”, Omega, Vol. 7, No. 6, PP. 553-556.
- Ghare, P. and G. Schrader. (1963). “A model for exponentially decaying inventory”, Journal of Industrial Engineering, Vol. 14, No. 5, PP. 238-243.
- Yang, P. C. and H. M. Wee. (2000). “Economic ordering policy of deteriorated item for vendor and buyer: An integrated approach”, Production Planning & Control, Vol. 11, No. 5, PP. 474-480.
- Wu, M. Y. and Wee, H. M. (2001). “Buyer-seller joint cost model for deteriorating items with multiple lot-size deliveries”, Journal of the Chinese Institute of Industrial Engineers, Vol. 18, No. 1, PP. 109-119.
- Zhou, Y. W. and S. D. Wang. (2007). “Optimal production and shipment models for a single-vendor–single-buyer integrated system”, European Journal of Operational Research, Vol. 180, No. 1, PP. 309-328.
- July, F., Nojavan, F. and Qysryha, A. (2011). “Inventory control of deterioration items in two-level supply chain”, Journal of Industrial Engineering, Vol. 45, PP. 69-77.
- Mahdavi, M. (2013). “Development of certain inventory control models for deterioration items by considering backlog shortage and discounts”, Journal of Industrial Engineering, Vol. 47, No. 1, PP. 69-80
- Lo, S. T., Wee, H. M. and Huang, W. C. (2007). “An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation”, International Journal of Production Economics, Vol. 106, No. 1, PP. 248-260.
- Goyal, S. (1977). “An integrated inventory model for a single supplier-single customer problem”, The International Journal of Production Research, Vol. 15, No. 1, PP. 107-111.
- Pan, J. C. H. and Yang, J. S. (2002). “A study of an integrated inventory with controllable lead time”, International Journal of Production Research, Vol. 40, No. 5, PP. 1263-1273.
- Goyal, S. (2003). “A note on: On controlling the controllable lead time component in the integrated inventory models”, INT.J.PROD.RES ,Vol. 41, No. 12, PP. 24-61.
- Ouyang, L. Y., Wu, K. S. and Ho, C. H. (2004). “Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time”, International Journal of Production Economics, Vol. 92, No. 3, PP. 255-266.
- Hoque, M. A. and S. K. Goyal. (2006). “A heuristic solution procedure for an integrated inventory system under controllable lead-time withequal or unequal sized batch shipments between a vendor and a buyer”, International Journal of Production Economics, Vol. 102, No. 2, PP. 217-225.
- Ouyang, L. Y., Wu, K. S. and Ho. C. H. (2007). “An integrated vendor–buyer inventory model with quality improvement and lead time reduction”, International Journal of Production Economics, Vol. 108, No. 1, PP. 349-358.
- Yang, J. S. and Pan. J. C. H. (2004). “Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment”, International Journal of Production Research, Vol. 42, No. 5, PP. 853-863.
- Mirzazadeh, A. (2011). “A Comparison of the Mathematical Modeling Methods in the Inventory Systems under Uncertain Inflationary Conditions”, International Journal of Engineering Science and Technology, No. 3, PP. 6131-6142.
- Jha, J. and Shanker, K. (2009). “A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying items”, International Journal of Production Research, Vol. 47, No. 24, PP. 6875-6898.
- Lin, H. J. (2012). “An integrated supply chain inventory model with imperfect-quality items, controllable lead time and distribution-free demand”, Yugoslav Journal of Operations Research, Vol. 23, No. 1, PP-87-109
- Jha, J. and Shanker, K. (2013). “Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints”, Applied Mathematical Modelling, Vol. 37, No. 4, PP. 1753-1767.
- Shahpouri, S. et al. (2013). “Integrated vendor–buyer cooperative inventory model with controllable lead time, ordering cost reduction, and service-level constraint”, The International Journal of Advanced Manufacturing Technology, Vol. 65, No. 5-8, PP. 657-666.
- Mandal, P. and Giri, B. (2015). “A single-vendor multi-buyer integrated model with controllable lead time and quality improvement through reduction in defective items”, International Journal of Systems Science: Operations & Logistics, Vol. 2, No. 1, PP. 1-14.
- Fauza, G. et al. (2016). “An integrated single-vendor multi-buyer production-inventory policy for food products incorporating quality degradation”, International Journal of Production Economics, Vol. 182, PP. 409-417.
- Lin, H. J. (2016). “Investing in lead-time variability reduction in a collaborative vendor–buyersupply chain model with stochastic lead time”, Computers & Operations Research, Vol. 72, No.1, PP. 43-49.
- Chan, C. K. et al. (2017). “An Integrated Production-Inventory Model for Deteriorating Items with Consideration of Optimal Production Rate and Deterioration during Delivery”, International Journal of Production Economics, Vol. 188, No. 1, PP. 1-13.
- Hossain, M. S. J., Ohaiba, M. M. and Sarker, B. R. (2017). “An optimal vendor-buyer cooperative policy under generalized lead-time distribution with penalty cost for delivery lateness”, International Journal of Production Economics, Vol. 188, No. 1, PP. 50-62.
|