Fattahi, Parviz, Samouei, Parvaneh, Zandiyeh, Mostafa. (1395). An Integrated Approach for Product-Mix Determination, Two-Sided Assembly Line Balancing and Worker assignment, Based on the Bottlenecks of System. , 50(3), 451-460. doi: 10.22059/jieng.2016.63176
Parviz Fattahi; Parvaneh Samouei; Mostafa Zandiyeh. "An Integrated Approach for Product-Mix Determination, Two-Sided Assembly Line Balancing and Worker assignment, Based on the Bottlenecks of System". , 50, 3, 1395, 451-460. doi: 10.22059/jieng.2016.63176
Fattahi, Parviz, Samouei, Parvaneh, Zandiyeh, Mostafa. (1395). 'An Integrated Approach for Product-Mix Determination, Two-Sided Assembly Line Balancing and Worker assignment, Based on the Bottlenecks of System', , 50(3), pp. 451-460. doi: 10.22059/jieng.2016.63176
Fattahi, Parviz, Samouei, Parvaneh, Zandiyeh, Mostafa. An Integrated Approach for Product-Mix Determination, Two-Sided Assembly Line Balancing and Worker assignment, Based on the Bottlenecks of System. , 1395; 50(3): 451-460. doi: 10.22059/jieng.2016.63176


سامانه مدیریت نشریات علمی. قدرت گرفته از سیناوب