New Method to Determine Buffer Size for High Risk Project Environment in Critical Chain Method | ||
Advances in Industrial Engineering | ||
مقاله 7، دوره 43، شماره 1 - شماره پیاپی 168451، اسفند 2009 اصل مقاله (364.38 K) | ||
نویسندگان | ||
Fatemeh Mansourian؛ Shossein Iranmanesh؛ Mohammad Tabesh | ||
چکیده | ||
In this research, a method for determining feeding buffer sizes in critical chain project scheduling is introduced. The method integrates project characteristics into the formulation as well as environment project risk. Resource tightness, environment risk and network morphology incorporate into the formulation. The method is tested and compared to three commonly suggested methods in the literature, the cut and paste method, the root square error method and adaptive procedure with resource tightness. The comparison is done by means of a simulation study using the kolicsh hartman data set. The test results indicate that all of the suggested methods generate better buffer sizes; therefore, they provide sufficient protection against the delays in project completion time. | ||
کلیدواژهها | ||
Critical Chain Method؛ Feeding Buffer؛ Project Risk؛ Project scheduling | ||