Shamsi, Mohammadjavad, Shahrokhi, Mahmoud. (1399). Selection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases. , 12(4), 634-654. doi: 10.22059/imj.2021.307002.1007768
Mohammadjavad Shamsi; Mahmoud Shahrokhi. "Selection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases". , 12, 4, 1399, 634-654. doi: 10.22059/imj.2021.307002.1007768
Shamsi, Mohammadjavad, Shahrokhi, Mahmoud. (1399). 'Selection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases', , 12(4), pp. 634-654. doi: 10.22059/imj.2021.307002.1007768
Shamsi, Mohammadjavad, Shahrokhi, Mahmoud. Selection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases. , 1399; 12(4): 634-654. doi: 10.22059/imj.2021.307002.1007768





سامانه مدیریت نشریات علمی. قدرت گرفته از سیناوب