Moradi, Vahed, yousefi nejad attari, mahdi, Farughi, Hiwa. (1397). Scheduling in two-machine robotic cells assuming tool switching time and dependency of the processing time ‎. , 52(4), 645-658. doi: 10.22059/jieng.2019.239904.1421
Vahed Moradi; mahdi yousefi nejad attari; Hiwa Farughi. "Scheduling in two-machine robotic cells assuming tool switching time and dependency of the processing time ‎". , 52, 4, 1397, 645-658. doi: 10.22059/jieng.2019.239904.1421
Moradi, Vahed, yousefi nejad attari, mahdi, Farughi, Hiwa. (1397). 'Scheduling in two-machine robotic cells assuming tool switching time and dependency of the processing time ‎', , 52(4), pp. 645-658. doi: 10.22059/jieng.2019.239904.1421
Moradi, Vahed, yousefi nejad attari, mahdi, Farughi, Hiwa. Scheduling in two-machine robotic cells assuming tool switching time and dependency of the processing time ‎. , 1397; 52(4): 645-658. doi: 10.22059/jieng.2019.239904.1421


Contact Us | Help & Support | Site Map

Journal Management System. Designed by sinaweb.