
تعداد نشریات | 163 |
تعداد شمارهها | 6,877 |
تعداد مقالات | 74,134 |
تعداد مشاهده مقاله | 137,824,456 |
تعداد دریافت فایل اصل مقاله | 107,228,882 |
Examining the readiness of Iran Transfo Rey Co., for performing the Lean Production System | ||
Industrial Management Journal | ||
مقاله 3، دوره 7، شماره 2، مهر 2015، صفحه 243-258 اصل مقاله (827.45 K) | ||
نوع مقاله: Research Paper | ||
شناسه دیجیتال (DOI): 10.22059/imj.2015.53195 | ||
نویسندگان | ||
Siyamak Baradaran1؛ Mohammadreza Daraei2؛ Davoud Fatahi* 3 | ||
1Assistant Prof., Faculty of Industrial Engineering, Islamic Azad University of Damavand, Damavand, Iran. | ||
2Assistant Prof., Faculty of Management, Payam Noor University, Tehran, Iran. | ||
3M.A. Student in EMBA, Faculty of EMBA, Islamic Azad University Science and Research Branch Damavand, Damavand, Iran. | ||
چکیده | ||
Nowadays, customers ask for high quality products with less cost. So, the organizations such as Iran Transfo Rey are looking for a solution to survive longer. Implementation of lean production can lead the company to its target. The main goal of this research is evaluating the readiness of Iran Transfo Rey Co. for performing the Lean Production System through dimensional analysis model. In this regard, 8 components and 66 factors have been recognized through conducted studies and their conformity to Lean Production was studied. The current research methodology is survey model including one main question and 8 sub-questions. Data was gathered through interview to experts and completing the questionnaires. Paired comparison technique was used for analyzing data. Validity of questionnaires approved by Experts and respectively final assessment was done through test re test. Findings show that Iran Transfo Rey Co. was 49% away from full conformity to lean production; and components including organization and leadership, human resource management and production process management had the most importance for lean production achievement. | ||
کلیدواژهها | ||
"Lean production dimension"؛ "Dimensional analysis"؛ "Lean production"؛ "Paired comparison" | ||
مراجع | ||
4. Ghodsypour, S.H. (2010). Analytical Hierarchy Process AHP. Tehran, Amirkabir University Press. (in persian) 8. Ranjbar, H, Haghdoust, A, Salsali, M., Khoshdel , A . , Soleimani , M. A., Bahrami , N. , (2012). Sampling in qualitative research. Research Journal of University of Medical Sciences. 10 (3): 238 - 250. (in persian) 10. Seyedhosseini , S. M., Bayattork , A. (2005). Evaluation of lean production factors in manufacturing organizations (Case study: Industrial Group SADID). Journal of Humanities. 9 (2): 59 -86. (in persian) 11. Shafiei Roudposhti, M, Mirghafouri, S.H. (2011). Evaluation of lean manufacturing techniques with an integrative approach of the hierarchical techniques (case study: Tile and ceramic industry in Yazd). Research Journal of Industrial Management. 9 (22 ) : 49 -74. (in persian) 14. Tavari, M., Soukhkian , M. A. , Mirnejad, S. A., (2009). Identify and prioritize the factors affecting the productivity of human resources using MADM techniques (Case: garment manufacturing companies). Scientific journal of Industrial Management Research, Tehran University. 1 (1) : 71-88 . (in persian) | ||
آمار تعداد مشاهده مقاله: 3,428 تعداد دریافت فایل اصل مقاله: 1,339 |